SS#1 project 9-11 004 sm

To upgrade pressure connections between Zones 502 and 432 at Ballinger Way NE Crossings…

IMG_1398 sm

Crews installed an underground Zone Control Vault with an 8” pressure relief valve…

Supply Stn 1 1624 sm

Roughly 2,710 feet of 12-inch water main (including 175 feet of Jack and Bore installation)…

IMG_1514 sm

Another 50 feet of 8-inch water main, plus roadway patching and private property restoration.