Supply Station #1
To upgrade pressure connections between Zones 502 and 432 at Ballinger Way NE Crossings… Crews installed an underground Zone Control Vault with an 8” pressure relief valve… Roughly 2,710 feet […]
To upgrade pressure connections between Zones 502 and 432 at Ballinger Way NE Crossings… Crews installed an underground Zone Control Vault with an 8” pressure relief valve… Roughly 2,710 feet […]
Every year, Seattle Public Utilities hosts an annual “Fix a Leak Week” campaign through the Saving Water Partnership. This year, we at Shoreline Water District decided to use this opportunity […]