This project will take place from the intersection at Beach Drive NE and 45th Avenue NE, to the bend in Beach Drive near 16578 Beach Drive NE.

In order to connect a water main under McAleer Creek that had been capped off on either side of the creek, the District hired Psomas Engineers  to help us identify the best method. Several options were considered in conjunction with the City of Lake Forest Park, and we agreed to use a “boring” machine instead of replacing and connecting the two existing water mains… as shown in the illustration above.

After completing multiple State Environmental Policy Act (SEPA) checklists and a Critical Areas report, Ryatt Construction was awarded the project on June 17, 2025, and we expect to start the project this summer. During construction, the contractor will need to use a portion of Beach Drive NE to the south of 16578 for roughly one week to lay out the 10” pipe before it is pulled into the bore pit and installed in place.

Design Engineer: Psomas
Contractor: Ryatt Construction LLC
Construction Bid: $836,907.87
Schedule:  Construction expected to begin this summer, and will take roughly 8-12 weeks to complete.